Rail transportation safety investigation R16C0065

The TSB has completed this investigation. The report was published on 17 January 2018.

Table of contents

Collision

Canadian Pacific Railway
Freight trains 303-646 and 113-31
Mile 171.7, Brooks Subdivision
Calgary, Alberta

View final report

The occurrence

On , Canadian Pacific Railway (CP) train 303 collided with CP train 113 at Mile 172, on the Brooks Subdivision in Calgary, Alberta. Train 113 was stopped with the head-end of the train at Alyth Yard and the tail-end south of the 50th Avenue overpass. As train 303 came around a curve, the crew observed the tail-end of train 113. The crew on train 303 initiated an emergency brake application. But, unable to stop, train 303 collided with the tail-end of train 113. Both locomotives and the first 2 cars on train 303 derailed, along with the tail-end car of train 113, a 3-platform container car. There were no injuries and there was no release of dangerous goods.

Media materials

News releases

2018-01-17

TSB releases investigation report into September 2016 collision and derailment involving two trains in Calgary, Alberta
Read the news release

Deployment notice

2016-09-03

TSB deploys a team of investigators to a rail accident in Calgary Alberta

The Transportation Safety Board of Canada (TSB) deploys a team of investigators to a Canadian Pacific Railway accident that occurred in the Alyth rail yard in Calgary, Alberta. The TSB will gather information and assess the occurrence.


Investigation information

Map showing the location of the occurrence


Investigator-in-charge

Photo of Don Crawford

Mr. Don Crawford has many years of national and international railway experience. In his early career, he was a locomotive engineer with Canadian National (CN) Railway on its British Columbia North Corridor and Vancouver based territories and with BC Rail on the former BC Rail property. In addition, Mr. Crawford has experience in training and supervisory roles and was a staff member at CN’s Gimli, Manitoba training facility. Internationally, Mr. Crawford worked in Kosovo after the 1998/99 war as part of the United Nations Peace Keeping effort helping to restore rail service to the country. Most recently, Mr. Crawford worked in Saudi Arabia as a locomotive instructor.


Photos


  Download high-resolution photos from the TSB Flickr page.

Class of investigation

This is a class 3 investigation. These investigations analyze a small number of safety issues, and may result in recommendations. Class 3 investigations are generally completed within 450 days. For more information, see the Policy on Occurrence Classification.

TSB investigation process

There are 3 phases to a TSB investigation

  1. Field phase: a team of investigators examines the occurrence site and wreckage, interviews witnesses and collects pertinent information.
  2. Examination and analysis phase: the TSB reviews pertinent records, tests components of the wreckage in the lab, determines the sequence of events and identifies safety deficiencies. When safety deficiencies are suspected or confirmed, the TSB advises the appropriate authority without waiting until publication of the final report.
  3. Report phase: a confidential draft report is approved by the Board and sent to persons and corporations who are directly concerned by the report. They then have the opportunity to dispute or correct information they believe to be incorrect. The Board considers all representations before approving the final report, which is subsequently released to the public.

For more information, see our Investigation process page.