Marine Investigation Report M93L0002

Grounding - "FEDERAL MACKENZIE"
Verchères-Contrecoeur Channel, Quebec

The Transportation Safety Board of Canada (TSB) investigated this occurrence for the purpose of advancing transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability. This report is not created for use in the context of legal, disciplinary or other proceedings. See Ownership and use of content.

Table of contents

    Summary

    While upbound in the St. Lawrence River, the laden bulk carrier "FEDERAL MACKENZIE" grounded on the south side of the Verchères-Contrecoeur Channel, Quebec. There was no apparent damage to the vessel and there were no injuries.

    The Board determined that the "FEDERAL MACKENZIE" grounded because of a loss of propulsion which, in turn, resulted in a loss of steering. The loss of propulsion was caused by the fuel control lever becoming displaced due to the vibration of the vessel while transiting a shallow channel.

    1.0 Factual Information

    1.1 Particulars of the Vessel

    "FEDERAL MACKENZIE"
    Official number 231726
    Port of registry Manila, Philippines
    Flag Philippine
    Type Bulk carrier
    Gross TonsFootnote 1 22,388
    Length 222.54 m
    Draught (at time of occurrence) FFootnote 2:7.86 m A:7.86 m
    Cargo 24,378 tonnes of steel products
    Crew 23
    Built 1983, Glasgow, Scotland
    Propulsion One four-cylinder Sulzer diesel engine rated 8,003 kW, driving a single controllable-pitch propeller. Bow thruster fitted.
    Owners Maple Shipping Corporation Manila, Philippines

    1.1.1 Description of the Vessel

    The "FEDERAL MACKENZIE" is a conventional-type bulk carrier with her cargo area forward and the bridge, accommodation, and engine-room aft.

    1.1.2 Engine Controls (See Photographs - Appendix A)

    The main engine can be controlled from three different positions, namely:

    • the emergency stand at the main engine;
    • the remote control in the wheel-house; and
    • the remote control in the engine-room.

    Regardless of the fact that the main engine may be remotely controlled from the bridge or the engine-room, the control at the emergency stand can override the remote stations.

    There are two levers at the emergency stand. Lever "A" controls the gear and is marked "Start", "Ahead", "Stop" and "Astern". Lever "B" controls fuel flow into the engine and is graduated 0 to 10. Below the "0" position is marked "Remote Control" at which position the lever is placed for such operation.

    Lever "B" has a button control on its end which is used for operating a locking device. However, evidence indicated that the ratchet lock had worn down and had lost its effectiveness.

    There is a warning light in the engine control-room to show that the engine is being controlled from the emergency stand. There is no such light on the bridge, where warning lights indicate "Engine-room Control" or Wheel-house Control" only.

    The wheel-house indicator light "Wheel-house Control" remains lit if the emergency stand lever "B" is moved out of the remote control position.

    A number of alarms are activated if the engine stalls.

    The controllable-pitch propeller revolves in a pivoting Kort nozzle which acts as a rudder.

    1.2 History of the Voyage

    After an uneventful Atlantic crossing, the "FEDERAL MACKENZIE" arrived at the Les Escoumins pilot station at 1940Footnote 3 on 13 July 1993. The vessel continued her voyage up the St. Lawrence River, bound for Toledo, Ohio, USA, under the conduct of a Canadian pilot. The engines were on bridge control.

    At 2107, 14 July, the vessel was proceeding up the Verchères-Contrecoeur Channel (see Appendix B for sketch of the area) at a speed of 10 knots over the ground. Evidence indicates that there was considerable vibration attributed at the time to shallow water beneath the keel. During the transit of the channel, the main engine failed. The engine-room employees were unable to restart the engines in time to avoid the grounding.

    When propulsion was lost, the vessel veered to port. Despite corrective helm action, the swing accelerated. At 2122, the vessel moved out of the navigable channel and grounded on the south side, approximately one cable east of buoy M79 in position 45°48′18″N, 73°19′19″W.

    Soon after the vessel grounded, lever "B" (fuel control) of the emergency stand was found in the "0" position. No one in the engine-room had moved the lever. After the lever was replaced in the remote control position, the main engine was restarted but attempts to refloat the vessel were unsuccessful until 0830, 19 July 1993, at which time she resumed her voyage to Toledo.

    1.3 Composition of the Bridge Watch

    At the time of the occurrence, the bridge watch consisted of a pilot, an officer of the watch (OOW), and a helmsman.

    1.3.1 Composition of the Engine-room Watch

    At the time of the occurrence, the engine-room watch consisted of an engineer of the watch (EOW), an electrician, and an oiler.

    1.4 Injuries to Persons

    There were no injuries.

    1.5 Damage

    1.5.1 Damage to the Vessel

    There was no apparent damage to the vessel.

    1.5.2 Environmental Damage

    There was no pollution.

    1.6 Certification

    1.6.1 Vessel

    The vessel was certificated, manned, and equipped in accordance with existing regulations.

    1.6.2 Personnel

    The master, the OOW, and the pilot held qualifications appropriate for the class of vessel on which they were serving and for the voyage being undertaken.

    The engineers held qualifications appropriate for the rating of the machinery on board.

    1.7 Personnel History

    1.7.1 Master

    The master had served in this capacity for 18 years and had been master of the "FEDERAL MACKENZIE" since 24 March 1993.

    1.7.2 Officer of the Watch

    The OOW had five years' experience as a deck officer. He joined the "FEDERAL MACKENZIE" on 28 March 1993. Working a routine sea-watch system, he was quite rested when reporting for duty at 2000.

    1.7.3 Helmsman

    The helmsman had three years' experience as a deck-hand and had acted as a helmsman throughout that period. He had been aboard the "FEDERAL MACKENZIE" since 26 March 1993.

    1.7.4 Pilot

    The pilot had conducted vessels in his designated area for 18 years. His schedule was such that an adequate rest period was provided between each assignment.

    1.7.5 Chief Engineer

    The chief engineer had served in this capacity aboard the "FEDERAL MACKENZIE" for 10 months, having had previous experience on similar vessels.

    1.8 Environmental Information

    1.8.1 Weather

    At the time of the occurrence, the weather conditions observed were good with south-westerly winds of 10 knots and good visibility. These conditions resembled the forecast issued earlier by Environment Canada.

    1.8.2 Tidal and Current Information

    The tidal influence at Contrecoeur is not significant. Between Lanoraie and Sorel, Quebec, the river current has an average rate of 1.8 knots to 2.0 knots.

    1.9 Navigation Equipment

    1.9.1 Vessel

    The navigation equipment was found to be in good working condition. It was not a contributory factor to this occurrence.

    1.9.2 Shore

    The shipping channel has a minimum width of 244 m and a least depth of 10.7 m.

    All navigation aids in the area were reported to be in position and operating normally at the time of the occurrence.

    2.0 Analysis

    2.1 Introduction

    The consequences of this occurrence could have been of a far more serious nature. A critical alarm system was not fitted. Furthermore, a situation which had been developing over a period of time, through wear and tear, had apparently gone unnoticed and/or unheeded.

    2.2 The Emergency Stand Fuel Control Lever

    The vessel's Operations Manual for Diesel Engines RL76 states in part that, if the emergency fuel lever (lever "B") is taken out of its position "Remote Control" and turned to position "0", the pressure in the air control system falls to zero. The air escapes from shut-down servomotor 5.06 and the engine is stopped by interruption of the fuel supply to the injection pumps through the regulating linkage.

    As no one in the engine-room had touched lever "B", it is most likely that it moved by itself from the "Remote Control" to the "0" position where it was found after the grounding.

    Shortly before the grounding, the vessel had experienced considerable vibration because of the effect on the propeller of the shallow water through which the vessel was moving. Because the ratchet used to hold the lever at a predetermined setting was worn, the vibration experienced could have been enough to displace the lever to the "0" position.

    When lever "B" moved to the "0" position, the engine stopped because of fuel starvation. Because the emergency stand controls override the other control stations, no subsequent movement of these other controls could correct the situation.

    The reason for the engine failure was not readily apparent to those attempting to restart the engine in the engine control-room because the engine had stalled and all the related alarms were on. It was thus difficult to identify the light which indicated that the engine was being operated from the emergency stand.

    2.3 Loss of Directional Control

    The vessel was fitted with a steerable Kort nozzle instead of the conventional propeller and rudder. Although this type of steering system is more efficient at moderate-to-high engine revolutions, its performance is less efficient at lower revolutions as its efficiency depends on propeller thrust.

    In this case, propeller thrust was lost when the engine failed, causing the vessel to lose directional stability almost immediately. After the engine failed, no subsequent movement of the helm could steer her back into the channel.

    3.0 Findings

    1. The "FEDERAL MACKENZIE" grounded because of a loss of propulsion and directional control.
    2. The main engine stopped because of fuel starvation caused by the emergency stand fuel control lever dislodging from the "Remote Control" to the "0" position.
    3. It is most likely that the lever was dislodged from the "Remote Control" position by the considerable vibration caused by the vessel navigating at 10 knots with a minimal underkeel clearance.
    4. Although the engines were being controlled remotely from the wheel-house, the controls at the emergency stand override all others.
    5. Because of the absence of an appropriate warning light on the bridge, the crew members in the wheel-house were not immediately aware of the loss of engine power.
    6. It was difficult for those attempting to restart the engine in the engine control-room to identify the warning light which indicated that the engine was being operated from the emergency stand, particularly as a number of alarms relating to the stalled engine were lit.
    7. As the steering is governed by the thrust of the propeller in a Kort nozzle, the steering ceased to function when the main engine failed.

    3.1 Causes and contributing factors

    The "FEDERAL MACKENZIE" grounded because of a loss of propulsion which, in turn, resulted in a loss of steering. The loss of propulsion was caused by the fuel control lever becoming displaced due to the vibration of the vessel while transiting a shallow channel.

    4.0 Safety Action

    Safety Action Taken

    The Board has no marine safety recommendations to issue at this time.

    This report concludes the Transportation Safety Board's investigation into this occurrence. Consequently, the Board, consisting of Chairperson John W. Stants, and members Zita Brunet and Maurice Harquail, authorized the release of this report on .

    Appendices

    Appendix A - Photographs

    Photo 1. The emergency stand at the main engine
    Image
    The emergency stand at the main engine
    Photo 2. Photograph
    Image
    Photograph

    Note:The wire was fitted to lever "B" and the grab

    rail after the accident to prevent the lever

    from vibrating upward.

    Appendix B - Sketch of the Area of the Grounding

    Figure 1. Sketch of the Area of the Grounding
    Image
    Sketch of the Area of the Grounding

    Appendix C - Glossary

    A
    aft
    EDT
    eastern daylight time
    EOW
    engineer of the watch
    F
    forward
    IMO
    International Maritime Organization
    kW
    kilowatt(s)
    m
    metre(s)
    N
    north
    OOW
    officer of the watch
    SI
    International System (of units)
    TSB
    Transportation Safety Board of Canada
    UTC
    Coordinated Universal Time
    W
    west
    °
    degree(s)
    minute(s)
    second(s)